Design/Build: Facilities on the Fast Track Therefore, for mission-critical facilities such as data centers, fast-track design/build is rapidly becoming the preferred model. The pay-off of compressing the traditional design-bid-build sequence can be huge; getting it done right is essential. Experience and resources are crucial to the success of any project. With nearly 30 years of experience in data center development, Total Site Solutions knows what needs to be done, what needs to happen now and what can wait. This knowledge and experience ensures that key milestones are achieved, budgets are met and schedules are kept. The essence of a “Fast Track Project” is working concurrently, instead of sequentially; having the construction team work together with the engineering team. This teaming allows for pre-purchase, multi-bid packages that are prepared early in the design process, greatly accelerating the overall project implementation process. With Fast Track, organizations are able to deploy technology faster, gain a competitive advantage and reap ROI sooner. A successful fast-track project requires strong, constant leadership and teamwork. Since mistakes can be costly, experience and resources are essential. As the project evolves, change is inevitable. Knowing and anticipating what and where changes most often occur, as well as what aspects are absolute, will minimize expensive delays and even more costly changes “on the ground.” That's why companies with mission- and time critical facilities rely on Total Site Solutions. Our Fast Track process allows for concurrent design/build solutions, thereby compressing the restrictive design-bid-build process without sacrificing cost, quality and control. Fast and Flexible
Focused Responsibility for Fast Results All documentation and communication is channeled through a single source dedicated exclusively to the project. Constant communication reduces potential problem areas from expanding, and the continuity of such relationships is integral to the success of a design/build project. Quick and Cost-Effective Fast Track can actually reduce costs while providing for an expedited return on investment. The Total Site team integrates competitive biding into the fast-track design/build process, obtaining preliminary pricing at 65% drawings, contractor bids at 95% and fine-tuning cost estimates with 100% drawings. Multiple Disciplines. One Solution. Total Site Solutions ' state-of-the-art expertise in IT and facilities ensures that the needs of both are me t. In fact, we've been doing so for nearly 30 years. The Total Site Solutions team pioneered high-availability infrastructure systems for specialized facilities. We were among the first to build reliable, available, maintainable, predictable and scalable infrastructure into the mission-critical facility. Our clients include some of the world's most demanding mission critical organizations, including Fortune 500 firms and US government agencies. Complete Facility Integration Find out how Total Site Solutions can help you put unprecedented levels of uptime and cost-effective operations on the fast track. |
Fast Track's concurrent design/build solutions compress the restrictive design/bid/build process, without sacrificing cost, quality and control.
|
FIGI | Privacy Policy | Careers Total Site Solutions, a Fortress International Group company |